The flow from Tinau River is used to generate 1.024 MW electricity.
The project has 2.462 km long tunnel, underground desilting chamber, and semi-underground powerhouse.
After the expiry of licence, the ownership was transferred to Nepal Electricity Authority (NEA).
[7] The plant is considered instrumental to train Nepali Technicians/Engineers in various disciplines such as tunnelling, hydropower construction.
[5] List of power stations in Nepal Download coordinates as: