Titan II GLV

[citation needed] During Titan II ICBM development, it had been found that the first stage turbopump gearbox was prone to total failure caused by resonant vibration in the idler gear.

[citation needed] There was also a potentially serious problem with the turbopump bearings which led to more design changes, however the odds of failing on a Gemini launch were slim to nil since GLV boosters used specially selected and tested bearings, in addition the turbopumps would be "hot fired" as part of prelaunch checks[citation needed] Combustion instability in the second stage engine was also a concern although that too had only been witnessed in static firing runs.

[citation needed] The most significant issue in man-rating the Titan II was resolving problems with resonant vibration known as "pogo" (since the action was said to resemble that of a pogo stick) that could produce g-forces sufficient to incapacitate astronauts,[citation needed] but the Air Force were not interested in helping NASA with a problem that did not affect the ICBM program and could potentially delay it, or require major modifications to the design.

However, Martin-Marietta argued that the pogo problem could be fixed fairly easily, and also the Air Force began to develop more of an interest in man-rating the Titan II due to the proposed Manned Orbiting Laboratory program.

[5] Another nuisance problem that occurred during the Gemini program was code-named "Green Man" and involved momentary pitch oscillations of the Titan second stage following engine cutoff.

As with the Mercury-Atlas launch vehicles, a high degree of workmanship was stressed as well as more thorough testing of components and improved handling procedures compared with Titans designed for uncrewed flights.

Titan II GLV first stage component assembly scheme.
Titan II GLV second stage component assembly scheme.
Titan with Gemini capsule in the Transonic Dynamics Tunnel (1964).