It originally meandered over the Monzi Flats, where it split into numerous slow-flowing channels before entering the St. Lucia Estuary at Honeymoon Bend.
The slow-moving water and reed beds in channels operated as a natural filtering system that removed silt from the Umfolozi floodwaters and created a rich habitat for numerous species.
The new Umfolozi canal resulted in the unfiltered water depositing its silt load after entering the slower moving St. Lucia Estuary.
The impact of this decision continues; the silt plume from the river is often blown by strong south winds as far north as Sodwana Bay, 100 km away.
In addition, it jeopardises the associated good snorkelling available at Cape Vidal, part of iSimangaliso Wetland Park, a UNESCO World Heritage Site.