The building was renovated in 1939, due to the increase of students, but it was decided that a new school should be built using land willed to the town by Enoch Cobb.
The school underwent a renovation in 1976, which added the field house, cafeteria, library and some classrooms nearby.
[8] In 2019, the library completed a $3.5M renovation,[9] which was overseen by librarian Sharon Morgan, who has been the center of some serious allegations of misconduct.
[10] $1M of the total $3.5M renovation budget was spent on "Smart Glass" that helps control temperature by brightening or darkening based on the amount of available light outside.
The new library consists of comfortable seating areas, moveable modular furniture with plug-ins for laptops and interactive television screens everywhere.