Between Warren Street and Wallingford Road to the southwest, the reservation was significantly wider than the tracks.
[5] While the line was shut down for track replacement from July 30 to September 10, 1983, the station was rebuilt with a low wall on the inbound platform to separate passengers from traffic, as well as a small shelter.
[7] In 2024, Warren Street and the other remaining non-accessible B Branch stops were added to the project.
[8][9] Media related to Warren Street station (MBTA) at Wikimedia Commons
You can help Wikipedia by expanding it.This tram-, streetcar-, or light rail-related article is a stub.