Developed by County Durham-based company the Banks Group, the farm was planned as the largest wind farm in North East England.
In 2009 it was purchased by the Electricity Supply Board[2] The wind farm has a nameplate capacity of 24MW, containing twelve Repower MM82 turbines each rated at 2MW.
[3] It was the first wind farm containing turbines supported on driven steel tubular piles.
This article about a British power station is a stub.
You can help Wikipedia by expanding it.This article about a wind farm is a stub.