A6182 road

The road's purpose is to link the city centre with the M18, from which drivers can reach the A1 and M1, and the now-closed Doncaster Sheffield Airport.

The upgrade of the part of the road from Lakeside Village Outlet to the M18 to dual carriageway was completed in June 2013.

The Great Yorkshire Way (formerly Finningley and Rossington Regeneration Route Scheme (FARRRS)) is a new road scheme[2] running between the M18 at Junction 3 and Doncaster Sheffield Airport, improving access primarily to the airport, Rossington and the new Doncaster iPort.

[5] Due to the nature of the road, a large number of industrial estates line the A6182, as well as the Lakeside Village and the main Royal Mail sorting office for Doncaster and most of East Yorkshire.

British Telecom, Royal Bank of Scotland, Tesco Insurance and Direct Line possess large call centres situated just off the road.

Underpass for the new road near Rossington under construction (2015)