Wujie Dam

Wujie Dam (Chinese: 武界壩; pinyin: Wǔjiè Bà) is a concrete gravity dam on the Zhuoshui River in Ren'ai Township, Nantou County, Taiwan.

The dam was built in two stages, from 1919 to 1922 and 1927–1934, and serves primarily to divert water from the Zhuoshui River to a storage reservoir at Sun Moon Lake and its associated hydroelectric projects (Mingtan Pumped Storage Hydro Power Plant and Minhu Pumped Storage Hydro Power Station).

The dam is located in a narrow gorge about 15 kilometres (9.3 mi) northeast of Sun Moon Lake.

The spillway of the dam consists of six gates with a capacity of 3,150 m3/s (111,000 cu ft/s).

This article about a dam or floodgate in Taiwan is a stub.