When first open, trains headed south along the original B&GR/Midland route via Fishponds to reach Bristol, although a connection was subsequently laid in to link this route with the rival Great Western Railway's 1903 "Badminton Line" from Wootton Bassett to Patchway (the current South Wales Main Line) in 1908.
Though jointly built by the two companies for the purpose of giving the GWR access to the Severn Rail Bridge and Severn and Wye Railway, it also provided an alternative route to Bristol Temple Meads via Filton and the Great Western soon made use of it to compete with the Midland for Bristol to Birmingham traffic, much to the dismay of the latter company.
A short section of the old route was retained from Yate South Junction after the rest closed, to serve a domestic waste transfer depot and fuel oil distribution terminal at Westerleigh sidings.
[5][6][7] The line has now (summer 2017) returned to use following the reopening of the quarry, with Mendip Rail running periodic stone trains.
An automated ticket machine was installed in mid-2007, but stopped functioning due to vandalism and is reported to be "unlikely to be replaced in the foreseeable future".