Alberni District Secondary School

Many additions were built onto this second school, including a cafeteria, full vocational training shops, a library and an auditorium.

The auditorium seated nearly 1000 and featured a large stage that was the venue for decades of performances, ceremonies and school functions.

The 22-acre site boasted multiple sports fields, a running track and tennis courts, and the Gym was home to decades of sporting events, including Totem Tournaments (basketball).

In January 1974, the roof was blown off the building and extensive damage was caused to the interior.

[2] School District 70 began construction on a new location for ADSS on Roger Street, near the intersection with 10th Avenue, in 2010 to replace the former school building at 4000 Burde Street, which closed at the end of June 2012.