Allal al Fassi Dam

Water reaches the power plant after being diverted by the Allal al Fassi Dam via an intake on the right bank of the reservoir.

It flows through a 15.45 kilometres (9.60 mi) long tunnel before reaching a compensating basin.

From the basin, water is sent through pipelines and finally penstocks to 3 x 80 megawatts (110,000 hp) Francis turbine-generators.

About 300 million cubic metres (240,000 acre⋅ft) of water is transferred through the power station annually.

The power station was commissioned in 1994 and generates 220 gigawatt-hours (790 TJ) on average annually.