Beitbridge Bulawayo Railway

The 3 ft 6 in (1,067 mm) Cape gauge BBR is a build-operate-transfer project that has shortened the distance between Bulawayo in Zimbabwe and South Africa to 317 kilometres (197 miles).

Prior to its inauguration, rail service between South Africa and Bulawayo used a route through Botswana that is about 200 kilometres (120 miles) longer.

The BBR is one of the three connected NLPI railway operations in Zimbabwe and Zambia that form a rail link between South Africa and the Democratic Republic of Congo.

After 30 years of service the BBR will be handed over to the National Railways of Zimbabwe at no cost.

It has had a profound negative impact on the profitability of Botswana Railways that saw its Zimbabwe-related freight volume drop by 90,000 to 10,000 tons.