Bozymchak is an open-pit copper mine and concentrator in Ala-Bukinsky region, Jalal-Abad, Kyrgyzstan; it also contains gold by-product.
It is being developed by KAZ Minerals.
The project commenced commissioning in 2014.
[2][3] In 2014, 426 kt of ore was mined at Bozymchak mine with an average copper grade of 1%.
[2] Bozymchak is expected to have an average annual output of 6 kt of copper cathode and 28 koz of gold bar over the 18 years of operational life.