Budhiganga Hydropower Project is a peaking run-of-river[2] type located at the Achham and Bajura districts of Nepal.
[3] The headworks of the project is located in a narrow gorge below Rakse Khand.
All major project structures are located on the left bank of the river.
The design flow is 27.63 m3/s and gross head is 90 m giving an output of 20 MW and annual average energy of 106.28 GWh.
[6] As of 2020, the access road construction, staff quarters and land acquisition have been completed.