Campbell High School (Georgia)

Since the ruling pertained only to the school name, it was decided the new colors and the new mascot would be left unchanged.

If accepted, students are enrolled in a rigorous curriculum in 9th and 10th grade during which they complete the majority of the Georgia required courses for graduation.

Along the northern end of campus is the 2000 Building (constructed January 2008), which replaced 12 portable classrooms and added many courses the school had previously not offered.

The old Band Room was renovated and expanded, making room for the Campbell Orchestra, while the Campbell drama department found a new home within the old choral and orchestra suites, which were modified to create a black-box theater and a technical theater classroom.

McDaniel Stadium (refurbished with new artificial turf and other amenities in fall 2010), is at the rear of the school.

It runs parallel to the connected back parking lot and bus port, which functions as the practice field for the Spartan Marching Band in the fall.

The current main entrance to Campbell High, the Nash Entrance and 2000 building visible on horizon
South Main Entrance of Campbell, formerly the Front Entrance of Wills High School
The northern half of the main building is the old Nash Middle building, as seen from Ward Street above
Football building