The wind farm was a joint venture of AC Energy Holdings, the Philippine Alliance for Infrastructure and the UPC Philippines Wind Holdco.
[1] The wind farm's groundbreaking took place on September 3, 2013, initially planned that the plant be connected to the national grid by June 2014.
AC Energy Holdings Inc. planned to increase the wind farms capacity to 81 MW (Safety Factored) by 2015.
[1] Residents belonging to at least 10 families living in barangays Malasin, Abaca, and Dadaur of Bangui, Ilocos Norte protested the installation of a 69 km transmission line, which they claimed passes through their land, and demanded for the transmission line to be relocated.