Before his appointment, he had carried out a number of surveys for the Commission, including one for a new lock at Culham in 1802, but the scale of the works were larger than any previously undertaken, and the plan was not implemented immediately.
It was 1,400 yards (1,300 m) long, with a lock at the lower end, constructed with stone walls, and with a relatively large drop for the time of 7 feet (2.1 m).
A new junction for the Wilts & Berks Canal has been constructed almost opposite the top end of Culham Cut as part of a restoration project.
The junction was opened on 30 August 2006, and initially runs for about 150 yd (137m) to a winding hole, but will eventually link to the historic route of the canal to the west of Abingdon.
After the bricked-up former entrance to the Wilts & Berks Canal there is an iron bridge over the mouth of the River Ock and then the town quayside.
The Thames Path follows the eastern bank over Culham Bridge and Andersey Island to Abingdon Lock, where it crosses over to the other side.