Dobra Bridge (A6)

It is 246.95 metres (810.2 ft) long and carries the motorway across five spans.

The bridge consists of two parallel structures, both completed in 2003 by Primorje.

[3] Traffic is regularly counted and reported by Autocesta Rijeka–Zagreb, operator of the viaduct and the A6 motorway where the structure is located, and published by Hrvatske ceste.

Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Adriatic resorts.

The traffic count is performed using analysis of motorway toll ticket sales.