[3] The bridge carried the A487 road across the River Dyfi between Machynlleth (Montgomeryshire/Powys) and the Corris community (Merionethshire/Gwynedd) prior to the opening of the New Dyfi Bridge upstream, after which it was closed off to vehicular traffic and the access road on the south side downgraded to an unclassified route, serving the adjacent fields, with responsibility for maintenance transferred to the local authorities.
[1] In 2011 a report was drawn up recommending the bridge was replaced or widened because of its strategic importance, as it had unsafe low parapets and a lack of footways, and had been repeatedly damaged by motor vehicles because of its poor sightlines.
Work was scheduled to start near the end of 2018 and the completion of the bridge (being ready for traffic) was envisaged in the summer of 2020.
[5] The start date was subsequently delayed till at least 2019, with a public enquiry possibly required depending on the results of consultation.
[7] Construction started in spring 2021 and the new bridge, named New Dyfi Bridge (Welsh: Pont Dyfi Newydd), was opened on 2nd February 2024 by Welsh Deputy Minister for Climate Change Lee Waters MS to vehicle traffic and pedestrians.