[1] The plant's train (liquefaction and purification facility) 1 has a capacity of 3.4 million metric tonnes per annum.
Several systems are in places such as feed gas metering, liquefaction, refrigeration, ethylene storage, boil off gas compression, product transfer to storage and LNG product metering.
[2] The EG LNG plant utilizes the ConocoPhillips Optimized Cascade (SM) Process.
[3] A planned second train will produce 4.4 million metric tonnes of LNG per annum.
[4] As a result, Train 2's ownership structure will be Sonagas 40%, Marathon 35%, Mitsui 8.5%, Marubeni 6.5%, Galp Energia 5% and Gas Natural Fenosa 5%.