Enfield Chase railway station

The original Enfield Station in Windmill Hill opened on 1 April 1871 as the terminus for the Great Northern Railway branch line from Alexandra Palace.

[5] By the end of the 19th century, there was a need to relieve the pressure on the main line to the north out of Kings Cross, and a plan to continue the Enfield branch to Hertford and Stevenage was conceived.

An Act of Parliament was passed in 1898, and the GNR set about acquiring and demolishing houses and compensating land owners in the area.

[6] The new Enfield Station was sited a few hundred yards to the east of the existing one, and raised above ground level so that north bound trains could access a new bridge crossing the road at Windmill Hill.

The first through train to Stevenage did not run until 4 March 1918, because of a host of legal and engineering difficulties, and shortages of men and material caused by World War I.

The original Great Northern Railway terminus station at Windmill Hill, Enfield, in 1898 (Enfield Local Studies Library and Archive)
The original Great Northern Railway terminus station at Windmill Hill, Enfield, in 1898 (Enfield Local Studies Library and Archive)
The platforms at Enfield Chase Station
The platforms at Enfield Chase Station