Flöha station

In addition to operations on the lines connecting to Flöha, the locomotives stationed here were also responsible for pushing trains on the ramp towards Freiberg.

[5] The present stately entrance building was built during a large reconstruction of the station in the 1930s.

The platforms can be reached by a passenger subway running all the way under the station from the entrance building to the town.

The station has been remotely-controlled by an electronic interlocking system since 18 July 2004, but signalbox W1 is still standing near the exit to Annaberg and a carriage shed; signalbox B2 was demolished in December 2007.

[6] In the summer 2016, the following services operated at Flöha station:

Flöha station building and station forecourt (May 2008)
Crossing of the RB 30 to Dresden (left) and RE 3 to Hof (right) in Flöha station on 11 June 2016 (last day of DB Regio operations on both services)