The vehicle movements are reduced and there is no need for detours since it can be done under traffic, making this process more convenient for local residents.
FDR with cement saves money while preserving natural resources by using existing materials and conserving virgin aggregates.
With proper engineering and testing protocols the FDR process provides a design life-cycle of 30 years.
Other pavement materials, such as concrete, asphalt, or aggregate base go through a rigorous quality control program that meets a qualified standard prior to site delivery and contractor installation.
The FDR process requires the same level of understanding and product controls during lab testing and field verification to meet long-term performance goals.