[5] The plans for the Grandview Heights Aquatic Centre were first announced in 2012 with a series of public open houses hosted by the City of Surrey in conjunction with Stuart Rothnie, architect for HMCA Architecture + Design.

[6] The opening of the facility was delayed in November 2015 by weeks due to a leaking air pipe in the leisure pool that was discovered during construction.

The natatorium includes an Olympic-size swimming pool, a leisure pool, a family hot tub and separate adult hot tub, a water slide, and a steam room and sauna in addition to numerous other water features.

[10] Grandview Heights Aquatic Centre has a unique timber roof system that spans 88 feet (27 m) in length.

The roof presents an "undulating" pattern enforced by steel cables and lengths of Douglas fir.

Main entrance to the facility