[5] The oxidising agent of the main engine is highly concentrated H2O2, as researchers from Institute have patented a unique method of obtaining this compound by distillation.
[7] The project was repeatedly awarded: the jury of International Invention and Innovation Show INTARG 2018 gave the platinum medal in category "Industry" and Ministry of Investment and Economic Development diploma.
Because of the need to adjust regulations to perform flights of AMBER and similar rockets, the boundaries of air space of CPSP Ustka were extended.
The service module is being prepared to host payloads – atmospheric sounding equipment or experiments using a micro-g environment[10] The first test flight took place in 2017 on Drawsko Military Training Ground, during which there were basic assumptions, mechanisms and infrastructure of rocket verified in-flight.
On 10 September 2019 there was another flight performed to test steering system and the recovery of payload from the surface of the Baltic Sea[12]