These experts were representative of the sponsoring organisations, including the Semiconductor Industry Associations of Taiwan, South Korea, the United States, Europe, Japan, and China.
The documents carried disclaimer: "The ITRS is devised and intended for technology assessment only and is without regard to any commercial considerations pertaining to individual products or equipment".
The documents represent best opinion on the directions of research and time-lines up to about 15 years into the future for the following areas of technology: Constructing an integrated circuit, or any semiconductor device, requires a series of operations—photolithography, etching, metal deposition, and so on.
[6] The organization was divided into Technical Working Groups (TWGs) which eventually grew in number to 17, each focusing on a key element of the technology and associated supply chain.
The methodology and the physics behind the scaling results for 2013 tables is described in transistor roadmap projection using predictive full-band atomistic modeling which covers double gate MOSFETs over the 15 years to 2028.