Water is diverted from barrage through 6.8 km long head race tunnel, through a surge shaft of 25 m dia.
The water flow is discharged back into Rangit river through a 40m tall race channel.
With installed capacity is of 96 MW project is expected to generate approximately 444.03 GWh per annum.
[1][5] The electricity generated is connected to switchyard near powerhouse and evacuated through double circuit 220 kV transmission line to the New Melli 220KV switching substation.
New Melli sub station is located about 10 km away from powerhouse and connected to Eastern Regional Grid.