[1] The project is developed and operated by North Eastern Electric Power Corporation Limited.
Khandong stage II powerhouse is located close to stage-I power station.
It has 1x25 MW turbine, connected via a 480 metres (1,570 ft) long water conductor system, which was provisioned for at the time of stage-I construction.
It is connected to Umrong reservoir via a 4.6 metres (15 ft) diameter, 5.5 kilometres (3.4 mi) long concrete-lined head race tunnel.
The 120 MW power project will be funded by the Asian Development Bank.
[5][6][7] The Hydro project site was submerged and flooded following a pipeline burst on 7 October 2019.