Kosovo B Power Station

The Republic of Kosovo's Energy Strategy for 2022-2031 outlines a plan for investment in the nation's lignite capacities to enhance system resilience and achieve emission standards compliance.

It includes refurbishing the Kosovo B1 and B2 power plant units to ensure a secure energy supply and lower emissions.

[1] The planned refurbishment of two units in the Kosovo B power plant, alongside at least one unit in the Kosovo A power plant, aims to secure a minimum baseload capacity of 540 MW and a strategic reserve capacity of 360 MW by 2030.

[2] Since then, it is operated by Kosovo Energy Corporation (Albanian: Korporata Energjetike e Kosovës (KEK)).

You can help Wikipedia by expanding it.This article about a Kosovar building or structure related topic is a stub.