[11] In 1970–71, the International Union of Railways (UIC, based on its French acronym) developed a master plan of fast intercity connections in continental Europe.

In 1982, recognizing German reluctance to extend the line into Germany, SNCF president André Chadeau announced that the company would not build the LGV Est without government subsidies.

[11] The LGV Est is a direct result of a project begun in 1985 with the establishment of a working group chaired by Claude Rattier and later by Philippe Essig.

In order to avoid offending the cities of Nancy and Metz, which share an ancient rivalry, and avoid problems encountered during the construction of the A4 autoroute twenty years earlier, this route traveled directly to Strasbourg and passed midway between Nancy and Metz, where a single station would be built to serve both towns and improve relations between them.

This was a favorable financial arrangement for SNCF due to low ridership projections and because the population of the towns served were below a threshold for building a high-speed line.

[21] Although a budget was not completed and the planned phasing of the project was opposed by Lorraine and Alsace,[22] the déclaration d'utilité publique was signed on 14 May 1996,[23] two days before the deadline after which a new public inquiry would have been required.

[13] The financing agreement for the first phase of the line from Vaires-sur-Marne to Baudrecourt was signed on 7 December 2000 between the numerous partners in the project, including 17 local governments.

[13] On 18 December 2003, the Jean-Pierre Raffarin government announced that it would proceed with several TGV projects, including construction of the second phase of the LGV Est, which would begin in 2010.

[27] Between the opening of the first and second phases, trains from Strasbourg, Colmar, and southern Germany travelled along the classic Paris-Strasbourg line until Réding, then the Réding–Metz railway [fr] to join the LGV Est at Baudrecourt.

[citation needed] Besides the construction of the LGV, the project includes: Journey times have decreased as follows: Earthworks for the first phase between Vaires-sur-Marne and Baudrecourt started in spring 2002.

[citation needed] As the first infrastructure project of its kind to be declared a public utility by the Ministry of the Environment, the LGV Est is also the first railway to be financed largely by the French regions and the European Union (EU).

The main contractor for the project is RFF (Réseau ferré de France), the state-owned company responsible for managing the French rail infrastructure.

[citation needed] Civil engineering works were distributed in eight contracts which were awarded after bidding by five companies: SNCF, ISL, Tractebel, Scétauroute and Setec.

[30] The opening of the second phase had been scheduled for 3 April 2016, but was delayed after a train derailed near Eckwersheim during commissioning trials, resulting in 11 deaths and damage to a bridge on the line.

[33] A series of high speed trials, named Operation V150, were conducted on the LGV Est prior to its June 2007 opening using a specially modified train.

The trials were conducted jointly by SNCF, TGV builder Alstom, and LGV Est owner Réseau Ferré de France between 15 January 2007 and 15 April 2007.

[34][35] The top speed of 574.8 km/h (159.7 m/s, 357.2 mph) was reached at kilometre point 193 near the village of Le Chemin, between the Meuse and Champagne-Ardenne TGV stations, where the most favourable profile exists.

French TGV network, with the LGV Est in brown running east from Paris
Illustration of the alignment of the second phase of the LGV Est.
TGV with world record power unit (V150) as ICE replacement Paris-Frankfurt in Saarbrücken Hbf in June 2008 (with German engine driver)