[6] Minerals and Metals Group acquired Las Bambas copper project from Glencore Xstrata plc.
[7] The polymetallic mine is located at altitude of about 4000 meters above sea level in Challhuahuacho District of Cotabambas Province in the Apurímac Region of the southern Peruvian Andes.
Geoservice Ingeniería prepared the Environmental Impact Assessment (EIA) for expansion of the Pillones transfer station.
[10] Production at the mine was scheduled to start in 2015 following an 80% confirmation completion of the project on 31 Dec 2014.
Golder Associates made the Environmental Impact Assessment (EIA) studies back on 2010, since then there have been two amendments to said studies one of them being carried by SNC-Lavalin on 2014, the amendment of EIA included updated project schedule, auxiliary components of the project and the respective water management system.