The Boring Company began construction in November 2019,[2] and has since continued intermittent tunnel drilling for planned stations.
The test demonstrated the new transport system could move up to about 4,400 passengers per hour with an end-to-end time of about two minutes.
[12] Subsequently, the Las Vegas Convention and Visitors Authority (LVCVA) has assumed an active safety monitoring role in the project.
[12] The transportation system consists of twin tunnels in which Tesla cars are driven by employees to shuttle passengers to stops at the Las Vegas Convention Center complex and Las Vegas transportation connections.
[23] Also in April 2024, it was reported that the next tunnel began construction, to connect the convention center to a station located at 3150 Paradise Road.