Line 2 (Lanzhou Metro)

Line 2 of the Lanzhou Metro is a subway line in Lanzhou running from Yanbai Bridge[1] to Dongfanghong Square, has 9 stations and is 9.06 kilometres (5.63 mi) long.

[2] The Phase 1 entered service on 29 June 2023.

Line 2 was planned to start construction at the end of 2015.

It will run from Yanbai Bridge to Dongfanghong Square, all within Chengguan District.

[4] In December 2017, tunnel boring for the second line commenced.