The first phase of Line 2 of Wuhu Rail Transit (Chinese: 芜湖轨道交通2号线; pinyin: Wúhú guǐdào jiāotōng èrhàoxiàn) runs between Wanchunhulu station to Jiuziguangchang station, with transfer to Line 1 at Jiuziguangchang station.
[1] It consists of 11 stations and 15.787 kilometres (9.810 mi) of track.
[2][3][4] It opened on 28 December 2021.
[2] The second phase of Line 2 is under planning and will be completed by 2025.
It will extend Line 2 to Jiangbei railway station.