Line 2 (Wuhu Rail Transit)

The first phase of Line 2 of Wuhu Rail Transit (Chinese: 芜湖轨道交通2号线; pinyin: Wúhú guǐdào jiāotōng èrhàoxiàn) runs between Wanchunhulu station to Jiuziguangchang station, with transfer to Line 1 at Jiuziguangchang station.

[1] It consists of 11 stations and 15.787 kilometres (9.810 mi) of track.

[2][3][4] It opened on 28 December 2021.

[2] The second phase of Line 2 is under planning and will be completed by 2025.

It will extend Line 2 to Jiangbei railway station.