(Buses in Malmö) (MalmöExpressen) In the following table, BRT systems in light blue are under construction.
MARTA's first bus rapid transit (BRT) line is currently under construction.
The construction is scheduled to be completed in 2025 with revenue service beginning in late 2025.
The line, named the "MARTA Rapid Summerhill", will utilize new 60-foot (18-meter) articulated electric buses.
Bogotá's segregated, four-lane TransMilenio system has a maximum peak-load capacity of 45,000 passengers per hour per direction (pphpd) on its busiest line.
[133] The system uses modular median stations that serve both directions and enable prepaid, multiple-door, level boarding.
[134] TransMilenio was described as a "model BRT system" in the National Bus Rapid Transit Institute's May 2006 report.
It serves Bogotá with high-capacity, articulated, three-door buses.
Bi-articulated buses are used on the busiest routes, and a smart card system is used for fare collection.