Litani River Dam

As a whole, the size of the dam is about 2 million cubic meters.

The Litany dam is also equipped with two taps to empty the lake.

The experts who administered the study of the Litani project all agreed that the location selected by the engineer, Ibrahim Abdul Aal, and the geologist, Dubertret, for the construction of the dam between Qaraoon and Suhmur, was the most sufficient geographical location and that is why it was authorized as the project venue.

[2] A service gallery, which is the pipe foundation, of 6,503 meters carries the water to the underground hydroelectric station.

The water then goes through transformers and produces a maximum of 185 megawatts.