The locks and dam were reviewed by the Board of Engineers for River and Harbours to replace the Ohio River locks and dams Number 35, 36, 37, 38 and 39.
Then the project was approved by the Secretary of the Army on March 11, 1953.
Construction on the locks began in March 1956 and they were placed in operation in May 1959.
The dam construction began in April 1959 and was finished in June 1964.
[2] On September 27, 2009, the 1,200-foot lock failed and the gates "mismitered" due to a solenoid malfunction.