Monte Ceneri Road Tunnel

The tunnel is situated under the Monte Ceneri Pass that separates the north of the canton around Bellinzona from the south of the canton around Lugano.

It forms part of the A2 motorway that links the north of Switzerland with Italy.

It was completed in 1984, and is 1,412 metres (4,633 ft) in length.

[1] The road tunnel is paralleled by the 1,692 metres (5,551 ft) long Monte Ceneri Rail Tunnel, carrying the Swiss Federal Railways Gotthard line under the same pass.

This article about a Swiss building or structure is a stub.