After crossing the bridge, Route 62 heads into a small industrial part of Totowa, where it intersects with the off-ramp from the westbound lanes of US 46.
The highway continues northward, intersecting with Furler Street and Lackawanna Avenue with jughandles in the northeastern quadrant.
The highway crosses over a Norfolk Southern railroad line before meeting I-80 at interchange 55A, where the route's designation terminates.
[8] Route 62 was left out of the Straight Line Diagrams produced by the New Jersey Department of Transportation in 2000,[9] but was returned the next year.
[10] Route 62 received improvements of the interchange with US 46 in 2006 at a cost of $22.748 million (2006 USD) to repair the bridge over US 46, ramp reconfigurations and new resurfaced roadway.