New Railway Bridge

[3] By the mid-20th century it became clear that the Old Railway Bridge can't service all the traffic.

It was designed by Nikola Hajdin, engineer and future president of the Serbian Academy of Sciences and Arts, and Ljubomir Jeftović.

[1][3] The construction was slowed down due to the property issues in the neighborhood of Senjak, where the bridge was to touch the ground on the right bank of the Sava.

[1][3] Though imagined as one of the central pieces of the new railway junction already by the end of the 1970s, it usefulness was connected with the construction of other sections of the project.

[3] As part of the reconstruction project of the Belgrade-Budapest trunk line, the section from Prokop (Centar) to Zemun is undergoing track modernization, which means that at the moment, one of the tracks on the bridge is closed for repairs, employing single-line working.