[2] This remained the status quo until 1912, when the Auckland Harbour Board initiated a reclamation project that included an area reaching out to Campbell’s Point.
Included in this project was a plan to extend King’s Drive (Quay Street) out to the point, but in order for this to happen the locomotive depot had to be moved as it straddled the road.
[2] Because the land was in a small gully, extensive earthworks were required to prepare the site, which were done by hand with the aid of horse-drawn muck trucks.
The idea of moving the engine sheds to Newmarket from the Auckland Railway Station was mooted as early as 1912, and cited as one of the reasons why the Parnell Tunnel would have to be duplicated.
[5] Unlike the other main centre workshops, locomotives were not constructed or rebuilt at Newmarket or Otahuhu, which specialised in repair and maintenance work.