Point Henry smelter

The Point Henry aluminium smelter was located near Geelong, Victoria in the suburb of Moolap prior to its closure in 2014.

[3] With 150 MW capacity, the power station was connected to the smelter by around 30 kilometres of high-voltage transmission lines, and was used to augment the supply from the Victorian electrical grid.

[5] In December 2013, the electricity hedge agreement between Loy Yang A and Point Henry was mutually terminated as a result of a court ordered mediation.

[6] Following a board meeting in February 2014, Alcoa Chief Executive Klaus Kleinfeld announced that the smelter—along with two rolling mills—would close at the end of 2014.

[7] Kleinfeld explained, "These assets are no longer competitive and are not financially sustainable today or into the future."

The wharf and unloader at Point Henry
View of the smelter from the East