Rapsani railway station

On 1 January 1971 the station, and most of Greek rail infrastructure where transferred to the Hellenic Railways Organisation S.A., a state-owned corporation.

Freight traffic declined sharply when the state-imposed monopoly of OSE for the transport of agricultural products and fertilisers ended in the early 1990s.

[2] In 2003, OSE launched "Proastiakos SA", as a subsidiary to serve the operation of the suburban network in the urban complex of Athens during the 2004 Olympic Games.

[9] OSE engineers were on the ground in the worst affected areas Domokos, Doxaras, and Paleofarsalos to assess the extent of the damage, and prepare detailed reports, and seek financial assistance from the European Union.

[12] OSE managing director, Panagiotis Terezakis, spoke of reconstruction works reaching 50 million euros, confirming at the same time that there will be no rail traffic in the effected sections of the network for at least a month.

[13] The devastation goes beyond the tracks and signalling, affecting costly equipment such as the European Train Control System (ETCS), which enhances rail safety.

[14] In November 2023, rail services resumed between Rapsani and Larissa following the devastating storm[15][16] The station is staffed, with a working Booking office (as of 2019) and waiting rooms.