[4][5] It is located north of the headquarters of the geographic information system company Esri (Environmental Systems Research Institute), who funded the station's construction.
[6] The station opened on October 24, 2022 and is served directly by the Arrow rail line.
[3][7][6] Metrolink's San Bernardino Line express trains to Redlands–Downtown utilize the main track, but do not stop at this station.
Arrow trains run every day between approximately between 4 a.m. and 11 p.m.
[8] This California train station-related article is a stub.