In 1913, with the widening of the canal, this was replaced by the Rendsburg High Bridge with a clearance height of 42 metres (138 ft).
Therefore, at the northern end of the bridge, an elevated railway was built in the form of a loop.
Trains from the south to Rendsburg need to make a 360-degree turn before entering the station.
Similarly, trains coming from the north after leaving Rendsburg station run over the loop on to the High Bridge to cross the Kiel Canal.
You can help Wikipedia by expanding it.This article about transport in Germany is a stub.