Saskatoon Freeway

The 55-kilometre (34 mi) route will connect Highway 11 (south) with Highway 7, forming a partial ring road around the city of Saskatoon.

As part of the project, Highway 11 would continue in Saskatoon along Wanuskewin Road (which becomes Warman Road and 2nd Avenue), while its current connection to Idylwyld Drive would be permanently closed.

The project does not include a southeastern leg which would connect Highway 7 to Highway 11 (south) and complete the circle, as it has been determined that the southwest leg of Circle Drive, completed in 2013, is sufficient to handle traffic for the foreseeable future.

Much as Circle Drive, at the time of its initial construction, encompassed most existing development in Saskatoon, the Saskatoon Freeway as currently routed will encompass most current and near-future development of the city, though some land within the city limits and beyond the freeway has been earmarked for future industrial, commercial and residential development.

The following is a list of future proposed interchanges, heading counter-clockwise.