The Taishir Hydro Power Station (Mongolian: Тайширын Усан Цахилгаан Станц) is a hydroelectric power station in Taishir, Govi-Altai Province, Mongolia.
[1] The water intake for the power station comes from Gegeen Lake.
The power station has an installed capacity of 11 MW.
[2] The power station and its dam was constructed with a cost of US$39 million.
You can help Wikipedia by expanding it.This article about a power station is a stub.