Tengah Plantation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
On 9 May 2018, the Land Transport Authority (LTA) announced that Tengah Plantation station would be part of the proposed 24-kilometre (15 mi) Jurong Region line (JRL).
[2][3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2028.
[4] The contract for the design and construction of Tengah Plantation station was awarded to a joint venture between John Holland Pty Ltd and McConnell Dowell South East Asia Pte Ltd for S$265.4 million (US$198.1 million) in March 2020.
The contract included the design and construction of the Tengah Park and Bukit Batok West stations and associated viaducts.