Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore.
On 9 May 2018, LTA announced that Toh Guan station would be part of the proposed Jurong Region line (JRL).
Contract J109 also includes the design and construction of the Jurong Town Hall and Pandan Reservoir stations and the 3.6-kilometre (2.2-mile) associated viaducts.
[5][6][7][8] Initially expected to open in 2027, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2028.
Access to the station will be via 2 exits on each side of Jurong East Central.