It is the tallest dam in the country and also creates the largest reservoir in the country, Lake Tisza.
It is a multi-purpose dam its purpose includes flood control and recreation.
Additionally, it supports a 28 MW hydroelectric power station, the largest in the country.
Construction on the dam began in 1968 and it along with the power station were completed in 1973.
This article about a dam, floodgate or canal in Europe is a stub.